Offers for businesses only (§ 14 BGB).

Core system replacement

Switch your core system without putting your data at risk

We make the data reliable and migrate it automatically and reproducibly.

Situation

The replacement is decided

The new system and the date are set. The open question is whether the data will be ready in time.

Data quality is unknown

How clean the legacy data is often only shows in the first trial migration.

Trial runs take a long time

Manual steps make every migration slow and hard to repeat.

Approach

01

Analyze the data

Table structures and data stores show how healthy the legacy system is and what has to be cleaned up before migration.

02

Automate the migration

Every run is automatic and reproducible, so the migration can be rehearsed as often as needed.

03

Manage the switch

We manage the switch from planning to go-live and deliver in stages of 4 to 8 weeks.

In practice

Platform replacement at a private bank

Turnaround of the data readiness stream with teams in the UK, Switzerland, India and the Philippines.

99.98 %

of the data migrated automatically and reproducibly overnight

€1.5 m

annual savings from consolidating paid benchmarks

Task force at an insurer

After a migration wave, the night job of the new contract platform failed. The task force found and fixed the root causes: defects in data conversion, inconsistent data types and incomplete conversion rules.

Planning a platform replacement?

Tell us about your situation. We will tell you where the risks are.

Arrange a call